K2 NIRSPEC Procedures 12 Jan 2001 Edition

114-36-11

If Cold Cycle Refrigeration CCR) system is running, i.e. NIRSPEC is COLD, then follow ALL steps in the procedure.

If NIRSPEC is WARM and the CCRs are off, then you may omit steps in blue lettering.

 

WARNING:

Be expeditious while the CCRs are off: Turning off the NIRSPEC CCRs provides approximately 10 min before the dewar vacuum pressure reaches an unacceptably high value. At that point, either the CCRs need to be powered on or a vacuum pump needs to be pumping on the dewar. Otherwise NIRSPEC will lose vacuum completely and will need to be warmed to ambient, pumped, and then cooled back to operating temperature, a 15 day process.

TOOLS

PERSONNEL

TIME


-K2 NIRSPEC Right Nasmyth Focus Installation-

COMPUTER ROOM

RIGHT NASMYTH PLATFORM

TELESCOPE

AO ENCLOSURE

TELESCOPE

AO ENCLOSURE

COMPUTER ROOM

MECHANICAL ROOM

AO ENCLOSURE (in parallel with the following tasks in the Computer Room)

COMPUTER ROOM (in parallel with the above tasks in the AO enclosure)

TELESCOPE

RIGHT NASMYTH DECK

MECHANICAL ROOM

RIGHT NASMYTH DECK

RIGHT NASMYTH PLATFORM

TELESCOPE

AO ENCLOSURE

CONTROL/COMPUTER ROOM

For Instrument Scientist: CONTROL ROOM or ELSEWHERE WITH NETWORK ACCESS



http:/www.keck.hawaii.edu/~electronics/operations/modules/nirspec.html

last modified: D. Sprayberry 12 January 2001